De Aar Grid Connection Design.

Concept and detailed design for grid connection of a solar IPP in the Northern Cape.

The Challenge

Grid compliance

Design needed to meet Eskom standards for IPP connection.

Multiple interfaces

Coordination between IPP, Eskom and local contractors.

Future-proofing

Design had to account for network growth and expansion.

The Solution

Delivered substation and overhead line concept-to-detail design.

Designed interface protocols for Eskom and IPP systems.

Provided costed bill of quantities and implementation timelines.

What We Offer

Grid connection design

Full overhead line and substation plans.

Interface protocols

Grid codes and control logics.

Design to BOQ

Build-ready documentation with material schedules.

Stakeholder coordination

Managed design between client and grid operator.

Project Scope

Concept design

Initial scope with layout and sizing.

Detailed engineering

Final system design with specifications.

Stakeholder engagement

Coordinated between parties for approvals.

Delivery pack

Issued IFC drawings and schedules.