Integrating packaged VRU units with existing tank structures posed mechanical challenges, including roof and shell load limits.
Process Safety Constraints
Overpressure protection needed to align with minimum VRU operating pressures while preserving tank integrity.
Tight Compliance Timelines
Engineering had to be delivered in step with regulatory deadlines and factory production demands.
The Solution
Collaborated with the technology licensor to ensure safe and functional integration with existing tank systems.
Developed a custom piping and process design that eliminated structural stress on the infrastructure.
Commissioned the full system within the client’s compliance window.
Delivered an innovative Brownfields solution without the need for Greenfields-style modifications.
What we Offer
Brownfields Design
Specialised integration of packaged units with existing tanks.
Custom Piping
Tailored process design for structural compatibility and minimal stress.
Licensor Collaboration
Worked with technology licensors to ensure safe implementation.
Turnkey Delivery
Project completed from design to commissioning within 14 months.
Project Scope
Technology Selection
Assisted the owner in selecting suitable vapour recovery unit (VRU).
Integration Design
Ensured compatibility with mechanical constraints.
Execution & Testing
Installed and commissioned the unit in line with compliance deadlines.
Civil Coordination
On-site coordination visible even via satellite imaging.
Our Safety Commitment
We prioritised air quality, mechanical safety, and structural integrity. Our solution ensured tank upgrades conformed to both environmental regulations and operational safety requirements.