Power Generation

Sicomp Control System Upgrade.

Upgrade of ageing 1985 control system with 3000+ I/O points through targeted replacement and SCADA integration.

The Challenge

Legacy System Failures

The original 1985 Sicomp control system was becoming increasingly unreliable, threatening plant continuity.

Cost of Full Replacement

A complete system overhaul was impractical due to the scale—over 3,000 I/O points made full replacement cost-prohibitive.

Integration Complexity

Maintaining continuity while upgrading required precise mapping between legacy hardware and modern interfaces.

The Solution

Analysed failure patterns to target only critical components for replacement.

Designed a new interface card to bridge legacy I/O with modern control systems.

Implemented a new SCADA and HMI for improved control and visualisation.

Completed the upgrade without triggering system downtime.

What We Offer

Targeted Legacy System Upgrades

Cost-efficient solutions for high-I/O ageing systems.

Custom Interface Design

Bridging legacy hardware with new-generation controls.

SCADA & HMI Modernisation

Delivered intuitive visual control and diagnostics.

Zero-Downtime Implementation

All changes made while maintaining live operations.

Project Scope

System Audit

Identified points of failure within the existing Sicomp infrastructure.

Hardware Integration

Developed interface cards to connect legacy I/O to new controls.

Software Modernisation

Installed and configured updated SCADA and HMI platforms.

Commissioning & Handover

Delivered complete upgrade with no safety or production incidents.

Windmill logo

Our Safety Commitment

All upgrades were performed without any safety incidents or operational disruptions. The approach protected existing infrastructure while delivering modern functionality with zero downtime.