The original 1985 Sicomp control system was becoming increasingly unreliable, threatening plant continuity.
Cost of Full Replacement
A complete system overhaul was impractical due to the scale—over 3,000 I/O points made full replacement cost-prohibitive.
Integration Complexity
Maintaining continuity while upgrading required precise mapping between legacy hardware and modern interfaces.
The Solution
Analysed failure patterns to target only critical components for replacement.
Designed a new interface card to bridge legacy I/O with modern control systems.
Implemented a new SCADA and HMI for improved control and visualisation.
Completed the upgrade without triggering system downtime.
What We Offer
Targeted Legacy System Upgrades
Cost-efficient solutions for high-I/O ageing systems.
Custom Interface Design
Bridging legacy hardware with new-generation controls.
SCADA & HMI Modernisation
Delivered intuitive visual control and diagnostics.
Zero-Downtime Implementation
All changes made while maintaining live operations.
Project Scope
System Audit
Identified points of failure within the existing Sicomp infrastructure.
Hardware Integration
Developed interface cards to connect legacy I/O to new controls.
Software Modernisation
Installed and configured updated SCADA and HMI platforms.
Commissioning & Handover
Delivered complete upgrade with no safety or production incidents.
Our Safety Commitment
All upgrades were performed without any safety incidents or operational disruptions. The approach protected existing infrastructure while delivering modern functionality with zero downtime.